Lessons Learned
| Lesson |
Title |
| GSFC-0010 |
Lessons Learned From The X-Ray Timing Explorer (XTE) |
| LLIS-0013 |
Fluid Sampling Techniques for Spacecraft Ground Support Equipment (Auxiliary Power Unit) |
| LLIS-0041 |
Emergency Power-Down Procedures for Multiple Fuel Cells; Fuel Cell Helium Ingestion; Crew Module Fire Alarm and/or Electrical Component Activations; Vehicle Data Down Link |
| LLIS-0050 |
Delta Wiring Harness Connectors and Installation |
| LLIS-0109 |
Space Shuttle Maine Engine (SSME) Work Stands |
| LLIS-0376 |
Galileo Spacecraft Transporter Excessive Humidity |
| LLIS-0683 |
Fabrication of Gaseous and Liquid Fluorine Systems |
| LLIS-0760 |
Eddy Current Testing of Aerospace Materials |
| LLIS-0765 |
Ultrasonic Testing of Aerospace Materials |
| LLIS-0819 |
Structural Stress Analysis |
| LLIS-0881 |
Fiber Optic Systems |
| CLL-0001 |
Chandra Lessons Learned |
| LLIS-1201 |
Flight Hardware Damage Due to Inadequate Test Planning and Insufficient QA Involvement |
| LLIS-1300 |
Review Test Procedure for Circuit Voltage Compatibility (2000) |
| LLIS-1388 |
Considerations for Lifting Hardware (without identified lift points) |
| LLIS-1387 |
Scaffolding Buildup To Include Human Factors Review |
| LLIS-1371 |
Shipping Container Susceptibility to ESD Charging |
| LLIS-1358 |
Current Limitation is Necessary for All Uses of Power Supplies |
| LLIS-1336 |
Verify Flight & GSE Cables Against Unit & System Schematics Prior to Test |
| LLIS-1764 |
Critical Facilities Maintenance Assessment |
| LLIS-1732 |
Forklift load test |
| LLIS-1728 |
Space Shuttle - Designing Environments Tests for Sustainability |
| LLIS-1725 |
Control Blow-By From Pyrotechnic Devices (2006) |
| LLIS-1719 |
Need for Change Analysis to Adjust Scope/Adequacy of Procedural Cautions and Warnings |
| LLIS-1718 |
Facilities Installation and Maintenance Records as Government Property |
| LLIS-1717 |
Process Control of Floor Level Procedures |
| LLIS-1713 |
Simulate the Launch Site RF Configuration During I&T |
| LLIS-1711 |
Deep Impact Reiterates the Need for Peer Review and Contractor Oversight (2005) |
| LLIS-1627 |
Aircraft impact by crew entry/maintenance stand Mishap Investigation |
| LLIS-1622 |
Aircraft Impacted By an Unsecured/Pressurized GN2 Hose |
| LLIS-1619 |
Mate/Demate, Verify, and Document Connectors One-at-a-Time (2003) |
| LLIS-1601 |
Article damage during testing/Test procedure deviation |
| LLIS-1597 |
E-2C Wing Scrape Close Call |
| LLIS-1582 |
Altered Explosive Initiator Causes Damage - 4-8-05 |
| LLIS-1580 |
This document contains lessons learned from the NOAA-N Prime mishap which occurred at Lockheed Martin Space Systems Company in Sunnyvale, CA on September 6, 2003. |
| LLIS-1575 |
Mission Assurance: Oversight/Insight of Contractor Quality Assurance (QA) |